Advertisement

Three Springs Road bridge repair ends

(WBKO)
Published: Jul. 31, 2018 at 9:17 PM CDT
Email this link
Share on Pinterest
Share on LinkedIn

The bridge reconstruction on Three Springs Road wrapped up Tuesday.

Since July 2nd the road on the bridge was down to one lane controlled by a temporary traffic signal, while Kentucky Transportation Cabinet crews removed the old bridge deck overlay with a new one.

They also resurfaced the approaches to the bridge for a smoother ride. The Cabinet says this was normal bridge maintenance in this heavy residential area.

Latest News

Latest News